The Altoona Transportation Center is a 300-space, 4-level parking structure built in 1972. It has post-tensioned lightweight concrete slabs and beams. It had a downward vertical expansion in 1984, which created authority offices, transit offices, waiting rooms, and retail space. The structure had post-tension tendon failures, and a portion of the roof was closed. It also had a failing lighting system, extensive concrete delaminations, and leaking in the transit offices. Other challenges were protecting hand-painted wall murals in the transit offices and keeping the garage open during repairs.